Bridge Extension

Client: Balfour Beatty Ltd

Balfour Beatty appointed Drayton Construction to carry out the widening and strengthening of an existing bridge over the By Brook River.

  • Works included laying new concrete foundations, lifting in pre-cast concrete arches, drainage and road resurfacing.
  • Protection measures for endangered species of English crayfish.
  • Planning the works to cope with flood situations which caused the river to rise by 3 metres,with little warning.

All works were completed on time and on budget.

Project value: £500,000